Files
dingtalk-workspace-cli/.github/workflows
chichuan c4f2ab631b fix(ci): assert the focused path's shard shape in the workflow contract
The workflow contract pinned the focused path by literal: the job name
`Test (changed packages)`, the unsharded
`list "$TEST_BASE_REF" "$TEST_HEAD_REF"` call, and a single
`go test -timeout=15m` line standing in for internal/app's package-level
headroom. Sharding the job changed all three literals, so `Test (workflow
and release contracts)` failed on this branch even though every shard
selection test passed.

Each invariant the contract guarded still holds, so the assertions are
updated to the new shape rather than relaxed:

- the focused job must still exist, now as the matrix job, named the way
  the contract already names `Test (race: ${{ matrix.shard }})`;
- package selection must still derive from the authoritative synthetic
  merge base/head, now with an explicit shard argument, so pointing it at
  any other ref still fails the contract;
- internal/app's headroom is asserted through the process-isolating
  helper and the per-shard budgets, mirroring the assertions already
  applied to test-race. That is stronger than the old single -timeout: it
  pins the mechanism that keeps the suite inside its budget rather than
  the number alone. release-scripts membership is asserted too, because
  its dedicated job only runs at full-suite or release-sensitive scope,
  so losing it here would silently stop testing test/scripts changes.

The shard comparisons in the focused job are quoted so that job reads
verbatim like test-race's.

Ablating the implementation one change at a time turns the contract red
in all five cases: removing the app helper call, dropping release-scripts
from the matrix, selecting from HEAD~1, collapsing the matrix back to a
single unsharded job, and dropping the cli/smoke timeout budget.
2026-08-15 22:58:30 +08:00
..
2026-07-20 17:14:35 +08:00